Fixing inspections in Pakenham

Linings, doors and joinery are in. We check the details that are about to be painted over or tiled against.

  • Linings, joinery and doors in, painters not yet started
  • 1 to 2 hours on site
  • Report within 24 hours
Request a quoteLeave your details and an inspector will ring you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage5 of 7
When to bookLinings, joinery and doors in, painters not yet started
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the VBA Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Pakenham fixing inspection

  • Water stop angles at bathroom and ensuite doors
  • Wet area penetrations sealed
  • Floor sheeting joints bandaged in wet areas
  • Upper floor sheeting fixed to pattern
  • Floors checked for level
  • Windows fixed along the base
  • Plasterboard joints and corners
  • Architraves, skirtings and doors hung true
  • Cavity sliders running on their guides
  • Joinery clear of cornices and walls
  • Brick expansion joints free of mortar
  • Base course and mortar finish outside
Why it matters here

Fixing inspections on Pakenham builds

Fixing stage items in Pakenham tend to be small things with long tails: a water stop at the ensuite door that stops short, upper floor sheets short of screws, a kitchen window with no fixings along its base, pipes through wet area walls left unsealed.

What we find at this stage in Pakenham

  • Water stop angles not run fully to the door frame
  • Upper floor sheeting short of fixings
  • Windows without fixings along the base
  • Unsealed penetrations through wet area walls
  • Mortar left in brick expansion joints
Ensuite floor sheet joints left without bandage ahead of waterproofing, found during a fixing inspection in Pakenham
Ensuite floor sheet joints left without bandage ahead of waterproofing
Digital level showing a section of upper floor out of level, found during a fixing inspection in Pakenham
Digital level showing a section of upper floor out of level
Brickwork expansion joint with mortar in it instead of flexible sealant, found during a fixing inspection in Pakenham
Brickwork expansion joint with mortar in it instead of flexible sealant
Sample findings

Sample defects found during our fixing inspections in Pakenham

Annotated findings from Fixing inspections.

Water stop angle at the ensuite door not run fully to the frame, found during a fixing inspection in Pakenham
Water stop angle at the ensuite door not run fully to the frame
Upper floor sheeting short of fixings, which leads to squeaks and movement, found during a fixing inspection in Pakenham
Upper floor sheeting short of fixings, which leads to squeaks and movement
Kitchen window missing base fixings and moving when pushed, found during a fixing inspection in Pakenham
Kitchen window missing base fixings and moving when pushed
Tap penetrations in a wet area wall left unsealed, found during a fixing inspection in Pakenham
Tap penetrations in a wet area wall left unsealed

The other stages of a Pakenham build

  1. Bored piers inspection in Pakenham1Bored piersHoles drilled and cages set, concrete not yet ordered
  2. Slab pre-pour inspection in Pakenham2Slab pre-pourSteel tied and formwork up, the day before concrete
  3. Frame inspection in Pakenham3FrameWalls standing and trusses on, before wrap and windows close it in
  4. Lock-up (pre-plaster) inspection in Pakenham4Lock-up (pre-plaster)Roof, windows, external doors and cladding on, before plaster
  5. Waterproofing inspection in Pakenham6WaterproofingMembrane on and cured, tiler not yet booked
  6. Pre-handover (PCI) inspection in Pakenham7Pre-handover (PCI)About a week before the handover meeting

All construction stage inspections in Pakenham →

Guides

Construction stage guides for Pakenham

All guides →

Book a fixing inspection in Pakenham

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Pakenham: common questions

Why do floor fixings matter?

Upper floor sheets short of screws or nails move and squeak, and the noise is hard to fix once carpet and tiles are down.

Is an unsealed tap penetration serious?

In a wet area it lets water behind the wall lining. It takes minutes to seal now and much longer to repair later.

Do you check the brickwork at this stage?

Yes, we walk the outside too. Expansion joints filled with mortar cannot move, which leads to cracking.

Is fixing the same as pre-handover?

No. Fixing is before painting and final trades. Pre-handover is the finished house.

How long is the fixing visit?

One to two hours depending on the number of rooms.

Which standards apply?

AS 2589 for plasterboard, AS 3740 for wet areas, AS 3700 for masonry and the Guide to Standards and Tolerances 2015.